Here some pictures of the rebuilt tees on either side of the 14/18 bridge.
This photo shows sod being rolled out on the 18
th forward tee. We elected to use 30 inch wide, 50 feet long rolls of sod to promote faster rooting, and in turn faster opening of the tees.
A shot of the sod being rolled out on the 14
th mid/front tee. Staff member Ray
Platt (right) and Assistant Superintendent Jon
Nappi prepare the tee surface for the sod.
Staff member Preston Gilbert cuts in the sod around the 14
th back tee.
From left, Peter
Rumery, Richard
Welch, and Bob
Marthia trim the sod around the 14
th back tee.
Next update May 22
nd. Thank You.
No comments:
Post a Comment