Thursday, September 3, 2009

Construction Prep Work

The pre-construction work has begun on the golf course. The two contractors, Leibold Irrigation and TDI Golf, have started to move in their equipment, and materials are beginning to arrive onsite. Leibold has set up their office trailer and irrigation part storage containers at the maintenance facility. As you play the course you may notice some paint lines in the rough, fairways and greens. The lines in the rough typically indicate pipe routing for the new irrigation system, while the green and fairway lines denote new mowing patterns.

This pictures show the future site of 2 irrigation controllers and a lightening siren. There are 8 controller sites on the golf course, and 5 lightening sirens.

The staging area for Leibold Irrigation, near the maintenance facility.

Unloading irrgation pipe between the 5th and 7th fairways. The pipe size ranges from 2" to 10".
More updates on the way!