The excavation and shaping of the pond is complete. Sodding of the banks, cart path work, and pump house construction are ongoing.
A photo of the pond before construction, taken from the 6th tee.
The new pond, from the 6th tee, filled to the "low water level". The pond now has an overflow structure that allows us to adjust the water level within a 2 foot range.
The pond from the causeway to the 5th green.
Looking back from the 6th green to the tee. The bank has recently been sodded.
The pump house foundation.