After a short holiday break, work is once again progressing on the golf course. The pump station was delivered in early January, and Leibold irrigation is on site continuing to put pipe into the ground.
The pump station on the truck, and awaiting installation.
Lowering the pump station into position on the pump house foundation. The station has a total of 3 pumps: 2, 40 HP pumps to power the sprinklers, and 1, 7.5 HP pressure maintenance pump.
One of the pump shafts being lowered into position.
Pump motor 2 ready for installation.