A current project we are working on is repairing some damaged areas on the putting greens. Most of the damage was sustained during the renovation project of 2009-10. Several greens were repaired last fall, and the work is continuing this spring. The process involves removing grass and dirt from the damaged areas and re-sodding with new bentgrass. Last fall we used grass from the practice putting green at the clubhouse, and this year we are using sod grown in Berwick, Maine.
Friday, May 20, 2011
Tuesday, January 19, 2010
Pump Station Delivery
After a short holiday break, work is once again progressing on the golf course. The pump station was delivered in early January, and Leibold irrigation is on site continuing to put pipe into the ground.
Thursday, November 19, 2009
Golf Course Feature Work
The work on the golf course improvements is 95% complete. All rebuilt tees have been sodded, and all new bunkers have been built, drained, and sodded. The remaining work includes the bunker at the 10th green, which needs new drainage and the right, 13th greenside bunker that needs new sand. All main drain lines have been installed, and there is about 2,000 feet of lateral drain pipe left to be installed. Please enjoy the photos.
Pond
The excavation and shaping of the pond is complete. Sodding of the banks, cart path work, and pump house construction are ongoing.